  4(Managing Information Systems)

  An organisation is reviewing the way that Information System (IS) projects are accounted for in the organisation. At

  present the Information Systems department (which undertakes the IS projects) is a non-recharged cost centre.

  However, the organisation wishes to explore the advantages and disadvantages of other charging approaches.

  Four approaches are being considered

  (1)Non-rechargeable cost centre (current situation)

  (2)Recharged at cost

  (3)Recharged at a mark up (profit centre)

  (4)Setting up a separate IS company

  Required:

  FOR EACH of the FOUR approaches listed above:

  (i)briefly describe the principle of the approach;(1 mark)

  (ii)briefly describe ONE advantage of the approach;(2 marks)

  (iii)briefly describe ONE disadvantage of the approach.(2 marks)

  The mark allocation shown is for each approach, four approaches are listed.

  (20 marks)

  5(Designing Information Systems)

  An organisation wishes to purchase a software package to administer its workflow requirements. It is currently drawing

  up an Invitation to Tender (ITT) to send out to potential suppliers.

  Required:

  (a)Identify and briefly describe the contents of FOUR possible sections of the Invitation to Tender which will be

  sent to the potential suppliers.(12 marks)

  (b)Some of the managers are sceptical about the formal drawing up of an ITT. Project manager, Mary Mendes,

  claims ‘our approach is to select a software package from a well-established software house, show it to the users

  and convince them that it is what they want. Ours is a much quicker approach than all this formal ITT stuff’.

  Explain the potential problems of Mary’s approach to software package selection and explain how these are

  overcome by a formal approach that includes the production of an ITT.(8 marks)

  (20 marks)

  4

  6(Evaluating Information Systems)

  An examination board currently has a system where the following details are held about examinations. There are

  currently 1,000 examinations on file, set by 100 examiners. Each examiner has set 10 examinations. There is a

  simple computer file (called ASSESSMENT) containing 1,000 records. Each record has the following structure:

  ASSESSMENT file

  Field nameLength of fieldType of field

  Examination number4Numeric

  Examination name30Character

  Examiner name30Character

  Examiner address50Character

  Passmark2Numeric

  相关推荐:

  2013年ACCA考试《F6税法》考前经验分享

  2013年ACCA《F4公司法和商法》考前经验分享

  2013年ACCA考试《F5业绩管理》考前经验分享

0
收藏该文章
0
收藏该文章
文章责编:zhangyadan0411  
看了本文的网友还看了
·ACCA考试辅导:F1考题练习(5)  (2018-01-24 18:41:05)
·ACCA考试辅导:F1考题练习(4)  (2018-01-24 18:40:37)
·ACCA考试辅导:F1考题练习(3)  (2018-01-24 18:40:08)
·ACCA考试辅导:F1考题练习(2)  (2018-01-24 18:39:22)
·ACCA考试辅导:F1考题练习(1)  (2018-01-24 18:38:30)
·2016年ACCA考试商务分析复习资料(2)  (2016-07-28 16:34:10)
文章搜索
关注官方微信
·考试资讯 ·学习资料
·考点预测 ·优惠活动
公众账号:考试吧
扫描二维码关注
距离{$DateYrar}年考试还有
报名时间 点击查看报名时间
准考证打印 在考试之前打印即可
考试时间 7月6-17\9月7-11\12月7-11日
成绩查询 考后1至3个月内公布
学位申请 通过9门课程后
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
还没有试卷
版权声明:如果ACCA-CAT考试网所转载内容不慎侵犯了您的权益,请与我们联系800@exam8.com,我们将会及时处理。如转载本ACCA-CAT考试网内容,请注明出处。
Copyright © 2004- 考试吧ACCA-CAT考试网 出版物经营许可证新出发京批字第直170033号 
京ICP证060677 京ICP备05005269号 中国科学院研究生院权威支持(北京)